Difference between revisions of "September 21, 2011"
Line 75: | Line 75: | ||
R(bottom) = 6.75E-4 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:Crimson"> '''7.29 n/min'''</span><br> | R(bottom) = 6.75E-4 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:Crimson"> '''7.29 n/min'''</span><br> | ||
R(upstream) = 15.84E-3 e+/pulse<br> | R(upstream) = 15.84E-3 e+/pulse<br> | ||
+ | |- | ||
+ | |<span style="color:blue">'''2523'''</span>||<span style="color:Lime">'''Down'''</span><br> 86A||In ||Open ||In ||Yes ||In||DU cylinder | ||
+ | |align="left"|<span style="color:blue">'''Long production run: -- pulses (-- minute run)<br>'''</span> | ||
+ | R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = <span style="color:Lime"> '''-- n/min'''</span><br> | ||
+ | R(upstream) = -- e+/pulse<br> | ||
|- | |- | ||
|<span style="color:blue">'''25--'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder | |<span style="color:blue">'''25--'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder |
Revision as of 18:33, 21 September 2011
Beam Parameters:
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2515 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
144632 pulses |
2517 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2519 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2520 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
162652 pulses |
Production Runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2521 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (60 minute run) Operator said the beam is really jittery |
2522 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) Operator said the beam is really jittery |
2523 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) Operator said the beam is really jittery |
25-- | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | In | None | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |