Difference between revisions of "September 21, 2011"
Line 65: | Line 65: | ||
|- | |- | ||
|<span style="color:blue">'''2521'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder | |<span style="color:blue">'''2521'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder | ||
+ | |align="left"|<span style="color:blue">'''Long production run: 0 pulses (90 minute run)'''</span><br> | ||
+ | Operator said the beam is really jittery<br> | ||
+ | R(bottom) = 7.64E-4 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:Crimson"> '''8.25 n/min'''</span><br> | ||
+ | R(upstream) = 16.89E-3 e+/pulse<br> | ||
+ | |- | ||
+ | |<span style="color:blue">'''25--'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder | ||
|align="left"|<span style="color:blue">'''Long production run: 0 pulses (90 minute run)'''</span><br> | |align="left"|<span style="color:blue">'''Long production run: 0 pulses (90 minute run)'''</span><br> | ||
Operator said the beam is really jittery<br> | Operator said the beam is really jittery<br> |
Revision as of 17:10, 21 September 2011
Beam Parameters:
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2515 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
144632 pulses |
2517 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2519 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2520 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
162652 pulses |
Production Runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2521 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: 0 pulses (90 minute run) Operator said the beam is really jittery |
25-- | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: 0 pulses (90 minute run) Operator said the beam is really jittery |
25-- | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: 0 pulses (90 minute run) R(bottom) = 0 n/pulse -> × 180 Hz × 60 sec/min = 0 n/min |
25-- | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: 0 pulses (30 minute run) R(bottom) = 0 n/pulse -> × 180 Hz × 60 sec/min = 0 n/min |
25-- | Down 86A |
In | Open | In | Yes | In | None | Long production run: 0 pulses (30 minute run) R(bottom) = 0 n/pulse -> × 180 Hz × 60 sec/min = 0 n/min |