Difference between revisions of "September 20, 2011"
Line 69: | Line 69: | ||
|- | |- | ||
|<span style="color:blue">'''2507'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||In||DU cylinder | |<span style="color:blue">'''2507'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||In||DU cylinder | ||
+ | |align="left"|<span style="color:blue">'''Long production run.'''</span> Operator said the beam is really jittery | ||
+ | <span style="color:blue">'''973769 pulses'''</span><br> | ||
+ | R(bottom) = 1264/973769 = 0.001298 n/pulse <span style="color:blue"> -> ×180×60 = '''14.0 n/min'''</span><br> | ||
+ | R(upstream) = 0.0288 e+/pulse<br> | ||
+ | |- | ||
+ | |<span style="color:blue">'''2508'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||Out||DU cylinder | ||
|align="left"|<span style="color:blue">'''Long production run.'''</span> Operator said the beam is really jittery | |align="left"|<span style="color:blue">'''Long production run.'''</span> Operator said the beam is really jittery | ||
<span style="color:blue">''' pulses'''</span><br> | <span style="color:blue">''' pulses'''</span><br> | ||
Line 74: | Line 80: | ||
R(upstream) = 0.0 e+/pulse<br> | R(upstream) = 0.0 e+/pulse<br> | ||
|- | |- | ||
+ | |||
|} | |} | ||
[https://wiki.iac.isu.edu/index.php?title=September_20,_2011 go up] | [https://wiki.iac.isu.edu/index.php?title=September_20,_2011 go up] |
Revision as of 18:09, 20 September 2011
summary what was been done
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2502 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
120664 pulses |
2503 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
121258 pulses |
2504 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
R(bottom) = 0.00137 n/pulse -> ×180×60 = 14.8 n/min |
2505 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
122247 pulses |
Production runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2506 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run. Operator said the beam is really jittery
972556 pulses |
2507 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run. Operator said the beam is really jittery
973769 pulses |
2508 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run. Operator said the beam is really jittery
pulses |