Difference between revisions of "September 20, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 42: Line 42:
  
 
|}
 
|}
 +
 +
 +
<span style="color:blue">'''Production runs'''</span>
  
 
{| border="1" cellspacing="0" style="text-align: center; width: 1000px "
 
{| border="1" cellspacing="0" style="text-align: center; width: 1000px "

Revision as of 14:22, 20 September 2011

go back

summary what was been done

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 10 um Al Target Comments
2502 Up
90A
In Open In Yes In DU cylinder Test radiator in/out.

120664 pulses
R(upstream) = 0.0012 e+/pulse
R(downstream) = 0.0272 e+/pulse

2503 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

121258 pulses
R(upstream) = 0 e+/pulse
R(downstream) = 0.00091 e+/pulse
About 97% of photons are coming from the radiator according to PS. Very Good

2504 Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

121258 pulses
R(upstream) = 0 e+/pulse
R(downstream) = 0.00091 e+/pulse

2505 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

121258 pulses
R(upstream) = 0 e+/pulse
R(downstream) = 0.00091 e+/pulse


Production runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 10 um Al Target Comments
2494 Up
90A
In Open In Yes In DU cylinder Long production run

pulses
R(beam down) = n/pulse -> ×180×60 = 6.8 n/min
R(upstream) = = e+/pulse


go up