September 15, 2011: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Shaproma (talk | contribs)
No edit summary
Shaproma (talk | contribs)
Line 18: Line 18:
==Upstream geometry measurements==
==Upstream geometry measurements==


[[File:Upstream measurement 9.15.11.png ]]
[[File:Upstream measurement 9.15.11.png | 600px]]
 


==Downstream geometry measurements==
==Downstream geometry measurements==

Revision as of 16:19, 16 September 2011

go back


The view flag was lost. So the vacuum was broken. During that time:

  • the radiator was reinstalled and recallibrated so we have now both 10um and 25 um of Al radiator.
  • The collimation system and target was more precisely realign.
  • The to left and right side 90 detectors was realign so now they are at the same level
  • the measurements of upstream and downstream geometry was made.


Radiator calibration

From the top start to count. The 25 um Al radiator will come first after 28 CCW turns and 10 um Al radiator will come second after 67 CCW turns.


Upstream geometry measurements

Downstream geometry measurements