Difference between revisions of "September 9, 2011"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 3: | Line 3: | ||
| − | {| border="1" cellspacing="0" style="text-align:   | + | {| border="1" cellspacing="0" style="text-align: center; width: 1100px "  | 
! scope="col" width="40" | Run #  | ! scope="col" width="40" | Run #  | ||
! scope="col" width="40" | Beam  | ! scope="col" width="40" | Beam  | ||
Revision as of 14:15, 9 September 2011
| Run # | Beam | Dump magnet | Collimator | Radiator | Target | Comments | 
|---|---|---|---|---|---|---|
| 2339 | Up 2 mm | In | Open | Up 2 mm | No | PS upstream rate is 2648/35092 = 0.075 e+/pulse | 
| 2341 | Up 2 mm | In | Open | Out | No | PS rate upstream rate is 1088/35494 = 0.031 e+/pulse |