Difference between revisions of "September 7, 2011"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
=Pair-spectrometer threshold calibration with beam= | =Pair-spectrometer threshold calibration with beam= | ||
− | ==By using analog counter. Beam On. Swip Off. Collimator | + | ==By using analog counter. Beam On. Swip Off. Collimator Open.== |
[[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]] | [[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]] | ||
Line 28: | Line 28: | ||
− | ==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip Off. Collimator | + | ==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip Off. Collimator Open.== |
[[File:Thresh upstream beam collim TDCdata 090711.png | 600px]][[File:Thresh downstream beam collim TDCdata 090711.png | 600px]] | [[File:Thresh upstream beam collim TDCdata 090711.png | 600px]][[File:Thresh downstream beam collim TDCdata 090711.png | 600px]] | ||
+ | |||
+ | ==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip Off. Collimator blocked.== |
Revision as of 19:01, 7 September 2011
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Kicker magnet calibration with viewscreen
Pair-spectrometer threshold calibration with beam
By using analog counter. Beam On. Swip Off. Collimator Open.
By using analog counter. Beam On. Swip On. Collimator Off.
was not done