Difference between revisions of "September 7, 2011"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
===Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.=== | ===Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.=== | ||
− | |||
− | |||
− | |||
− | + | ===Pair-spectrometer threshold calibration with cosmic. Beam On. Swip On. Collimator Off.=== | |
− |
Revision as of 15:37, 7 September 2011
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.