Difference between revisions of "September 7, 2011"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
− | ===Pair-spectrometer | + | ===Pair-spectrometer threshold calibration with cosmic. Beam Off. Collimator blocked. Swip magnet out=== |
====Current Connection==== | ====Current Connection==== | ||
Line 19: | Line 19: | ||
*downstream: A6 | *downstream: A6 | ||
− | |||
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]] | [[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]] |
Revision as of 15:00, 7 September 2011
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Pair-spectrometer threshold calibration with cosmic. Beam Off. Collimator blocked. Swip magnet out
Current Connection
- upstream: A5
- downstream: A6