Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 13: Line 13:
  
  
===Pair-spectrometer turn up with cosmic. Beam On===
+
===Pair-spectrometer threshold calibration with cosmic. Beam Off. Collimator blocked. Swip magnet out===
  
 
====Current Connection====
 
====Current Connection====
Line 19: Line 19:
 
*downstream: A6
 
*downstream: A6
  
====Threshold calibration with cosmic====
 
  
 
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]
 
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]

Revision as of 15:00, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Pair-spectrometer threshold calibration with cosmic. Beam Off. Collimator blocked. Swip magnet out

Current Connection

  • upstream: A5
  • downstream: A6


Thresh upstream cosmic.png Thresh downstream cosmic.png