Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 11: Line 11:
 
       versus blocked, ...
 
       versus blocked, ...
 
* Check detector rates with D2O. See if we can get a good time of flight spectrum.
 
* Check detector rates with D2O. See if we can get a good time of flight spectrum.
 +
 +
 +
===Pair-spectrometer turn up with cosmic. Beam On===
 +
 +
====Current Connection====
 +
*upstream: A5 
 +
*downstream: A6
 +
 +
====Threshold calibration with cosmic====
 +
 +
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]

Revision as of 14:58, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Pair-spectrometer turn up with cosmic. Beam On

Current Connection

  • upstream: A5
  • downstream: A6

Threshold calibration with cosmic

Thresh upstream cosmic.png Thresh downstream cosmic.png