Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
  
Wednesday Run Plan
+
===Wednesday Run Plan===
  
 
* Tune up beam
 
* Tune up beam

Revision as of 14:34, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.