Difference between revisions of "September 4, 2011"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
====Threshold calibration with cosmic==== | ====Threshold calibration with cosmic==== | ||
+ | [[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]] | ||
− | + | ====Threshold calibration with beam on. Collimator blocked==== | |
+ | |||
+ | Need to be done |
Revision as of 04:16, 5 September 2011
Pair-spectrometer turn up
Current Connection
- upstream: A5
- downstream: A6
Threshold calibration with cosmic
Threshold calibration with beam on. Collimator blocked
Need to be done