Difference between revisions of "HRRL 03-18-2011"
Jump to navigation
Jump to search
| Line 7: | Line 7: | ||
|D1 current||Energy || Charge | |D1 current||Energy || Charge | ||
|- | |- | ||
| − | |(A)||MeV || FC | + | |(A)||MeV || mV|| FC scope pic |
|- | |- | ||
|28 ||11.85 || [[File:FC2_0318011_28A_11.85.png| 200 px]] | |28 ||11.85 || [[File:FC2_0318011_28A_11.85.png| 200 px]] | ||
Revision as of 16:53, 18 March 2011
Scan Qaud 1
To test reproducibility from yesterday. Scan at 40, 20, 10, 5 mA peak currents. Scan twice on each Current.
Do Energy Scan
Bend the beam through 45 bending dipole, take images on the scope of FC and YAG images.
| D1 current | Energy | Charge | |
| (A) | MeV | mV | FC scope pic |
| 28 | 11.85 | ||
| 29 | 12.3 | ||
| 30 | 12.74 | ||
| 30.5 | 12.96 |