Difference between revisions of "PhotoFiss 3-7-11"
Jump to navigation
Jump to search
(→Runs) |
|||
Line 26: | Line 26: | ||
| Date || Run Number || Comment | | Date || Run Number || Comment | ||
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1905 || Rad out, sweep magnet out, no physics target, looking at background into shielded cell |
+ | |- | ||
+ | | 3/7/11 || 1906 || Adjusted pulse start width | ||
+ | |- | ||
+ | | 3/7/11 || 1907 || Moved gamma peak on TDC spectrum to ~100ns | ||
+ | |- | ||
+ | | 3/7/11 || 1908 || Longer run to get more data | ||
+ | |- | ||
+ | | 3/7/11 || 1909 || Moved pair spec and ps sweep magnet centered on off axis beam | ||
+ | |- | ||
+ | | 3/7/11 || 1910 || Beam put into shielded cell, no target | ||
+ | |- | ||
+ | | 3/7/11 || 1911 || Radiator in, TDC gamma peak using no target | ||
+ | |- | ||
+ | | 3/7/11 || 1912 || 1" lead brick as physics target | ||
+ | |- | ||
+ | | 3/7/11 || 1913 || Radiator out | ||
+ | |- | ||
+ | | 3/7/11 || 1914 || Radiator in, bending beam down, lead target | ||
+ | |- | ||
+ | | 3/7/11 || 1916 || Radiator in, bending beam up, lead target | ||
+ | |- | ||
+ | | 3/7/11 || 1917 || e- sweep magnet put in, kicker magnet off, radiator in | ||
+ | |- | ||
+ | | 3/7/11 || 1918 || Polina thresh lowered to -200mV, no target | ||
+ | |- | ||
+ | | 3/7/11 || 1919 || Radiator out, no target | ||
+ | |- | ||
+ | | 3/7/11 || 1920 || Water stop in | ||
+ | |- | ||
+ | | 3/7/11 || 1921 || Water stop out, radiator in, 8" Lead blocking collimator hole | ||
+ | |- | ||
+ | | 3/7/11 || 1922 || Gate valve in | ||
+ | |- | ||
+ | | 3/7/11 || 1923 || Seperated start and stop pulse by xx ns | ||
+ | |- | ||
+ | | 3/7/11 || 1924 || Removed 8" Lead from collimation hole, D2O physics target in, Radiator in, sweep magnet in | ||
+ | |- | ||
+ | | 3/7/11 || 1925 || Removed physics target | ||
+ | |- | ||
+ | | 3/7/11 || 1926 || Removed Lead shielding Irina, D2O Physics target | ||
+ | |- | ||
+ | | 3/7/11 || 1927 || Removed physics target, added Lead to other 44 MeV port | ||
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1928 || D2O target in |
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1929 || Removed Lead shielding in front of all neutron detectors, removed physics target |
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1930 || Re-do of run 1929, but shifted gamma peak on TDC |
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1931 || D2O target in, radiator in |
|- | |- | ||
− | | 3/7/11 || | + | | 3/7/11 || 1932 || Reinstalled Lead shielding in front of neutron detectors, kicker magnets up with 95A |
|- | |- | ||
| 3/7/11 || || | | 3/7/11 || || | ||
Line 53: | Line 95: | ||
|- | |- | ||
| 3/7/11 || || | | 3/7/11 || || | ||
+ | |||
|} | |} | ||
Revision as of 22:06, 7 March 2011
TDC Map
TDC Chan | Detector |
1 | Event Trigger |
12 | Sofiia (neutron detector Beam Right down) |
13 | Natali (neutron detector Beam Left down) |
14 | Irina (neutron detector Beam left center) |
15 | Polina (neutron detector Beam left top) |
Runs
Date | Run Number | Comment |
3/7/11 | 1905 | Rad out, sweep magnet out, no physics target, looking at background into shielded cell |
3/7/11 | 1906 | Adjusted pulse start width |
3/7/11 | 1907 | Moved gamma peak on TDC spectrum to ~100ns |
3/7/11 | 1908 | Longer run to get more data |
3/7/11 | 1909 | Moved pair spec and ps sweep magnet centered on off axis beam |
3/7/11 | 1910 | Beam put into shielded cell, no target |
3/7/11 | 1911 | Radiator in, TDC gamma peak using no target |
3/7/11 | 1912 | 1" lead brick as physics target |
3/7/11 | 1913 | Radiator out |
3/7/11 | 1914 | Radiator in, bending beam down, lead target |
3/7/11 | 1916 | Radiator in, bending beam up, lead target |
3/7/11 | 1917 | e- sweep magnet put in, kicker magnet off, radiator in |
3/7/11 | 1918 | Polina thresh lowered to -200mV, no target |
3/7/11 | 1919 | Radiator out, no target |
3/7/11 | 1920 | Water stop in |
3/7/11 | 1921 | Water stop out, radiator in, 8" Lead blocking collimator hole |
3/7/11 | 1922 | Gate valve in |
3/7/11 | 1923 | Seperated start and stop pulse by xx ns |
3/7/11 | 1924 | Removed 8" Lead from collimation hole, D2O physics target in, Radiator in, sweep magnet in |
3/7/11 | 1925 | Removed physics target |
3/7/11 | 1926 | Removed Lead shielding Irina, D2O Physics target |
3/7/11 | 1927 | Removed physics target, added Lead to other 44 MeV port |
3/7/11 | 1928 | D2O target in |
3/7/11 | 1929 | Removed Lead shielding in front of all neutron detectors, removed physics target |
3/7/11 | 1930 | Re-do of run 1929, but shifted gamma peak on TDC |
3/7/11 | 1931 | D2O target in, radiator in |
3/7/11 | 1932 | Reinstalled Lead shielding in front of neutron detectors, kicker magnets up with 95A |
3/7/11 | ||
3/7/11 | ||
3/7/11 | ||
3/7/11 | ||
3/7/11 | ||
3/7/11 | ||
3/7/11 | ||
3/7/11 |