HRRL OTR Test Feb 16th 2011: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Setisadi (talk | contribs)
Setisadi (talk | contribs)
Line 85: Line 85:


== Second Fusing ==
== Second Fusing ==
===Focused With Lenses,140 mA 58Hz 100ns===





Revision as of 17:48, 17 February 2011

Objectives

1.) Check alignment of the OTR target and beam line with the linac's central axis. If it is misaligned we will work on an alignment plan to be executed after the Wednesday beam test.

2.) Take OTR images, check image focus and light output.

3.) Determine which quad to use for emittance measurements. Establish a quad current scan range.

Steps

Practise Turning HRRL On

Make document of the whole process, write a Standard Operation Process (SOP).

Turn RF off, Try to see Image with filament on

If we can see filament spot on the OTR target, try to focus our image system.

Turn RF On

Turn RF on look at the images, take pictures of the image upload them to the wiki.


Experiment

First Fusing

Image on OTR target

Lights RF image
on off
on (different contrast) off
off off
on on (27 Hz)

RF:25-205, Peak Current50mA, Pulse Width_200ns (fwhm)

RF:25, Peak Current60mA, Pulse Width_200ns (fwhm)


RF:50


Second Fusing

Focused With Lenses,140 mA 58Hz 100ns

Determine the smallest energy, beam current, pulse width, and rep rate for a visible image.



Back to Positrons