Difference between revisions of "Emittance Test"
Jump to navigation
Jump to search
Line 95: | Line 95: | ||
+ | =Leveling Survey= | ||
+ | Downstream of the beam up by 2.6 mm. | ||
+ | |||
+ | [[File:Constructed_Beam_Line_for_Emittance_Test_Leveling_Survey.jpg | 300 px]] | ||
Revision as of 22:36, 8 July 2010
Design
New deisign: We changed to use just one magnet.
HRRL had steer magnets on itself. We don't need external steer magnets. But Dr. Chouffani said that we might need them after quads, if the quads are not on axis. He will think about it.
File:Emittance Test Optim File.txt
Faraday Cup
Old Beam Line
Beam Line Parts
Constructed Beam Line for Emittance Test
Vacuum pressure on the beam line is less than
torr (on 2010-July-7th).
Leveling Survey
Downstream of the beam up by 2.6 mm.
Go back Positrons