Difference between revisions of "Qweak GEM installation log book"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
=12-05-2010=
 +
 +
==Detector installation==
 +
The Qweak GEM detector has been installed in the doghouce in Hall-C and the HV was turned on. On the scope picture below is shown the GEM trigger out pulse, after it has been amplified and integrated with timing filter amplifier. The high voltage supply is placed in the doghouse with the other electronics.
 +
 
[[File:GEMTrigOutinDoghouse-12-05-2010.jpg|300px]]
 
[[File:GEMTrigOutinDoghouse-12-05-2010.jpg|300px]]
  

Revision as of 16:59, 13 May 2010

12-05-2010

Detector installation

The Qweak GEM detector has been installed in the doghouce in Hall-C and the HV was turned on. On the scope picture below is shown the GEM trigger out pulse, after it has been amplified and integrated with timing filter amplifier. The high voltage supply is placed in the doghouse with the other electronics.

GEMTrigOutinDoghouse-12-05-2010.jpg


GEMTrigOutandGEMdetectorinDoghouse-12-05-2010.jpg

GEMSetUPinDoghouse-12-05-2010.jpg


GEMNIMBINandModulese-12-05-2010.jpg

GEMGumstixandI2CNIMModuleinDoghouse-12-05-2010.jpg


GASbottleoutsidetheDoghouse-12-05-2010.jpg

GEMShieldedRibbonCables-12-05-2010.jpg