The Qweak GEM detector has been installed in the doghouce in Hall-C and the HV was turned on. On the scope picture below is shown the GEM trigger out pulse, after it has been amplified and integrated with timing filter amplifier. The high voltage supply is placed in the doghouse with the other electronics. | |||
[[File:GEMTrigOutinDoghouse-12-05-2010.jpg|300px]] | [[File:GEMTrigOutinDoghouse-12-05-2010.jpg|300px]] | ||
Revision as of 16:59, 13 May 2010
12-05-2010
Detector installation
The Qweak GEM detector has been installed in the doghouce in Hall-C and the HV was turned on. On the scope picture below is shown the GEM trigger out pulse, after it has been amplified and integrated with timing filter amplifier. The high voltage supply is placed in the doghouse with the other electronics.