Difference between revisions of "HRRLrun 3-22-26-2010"
(Created page with 'HRRL run on March 22-26 2010 Preliminary setup =3/17/10= Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table. Install c...') |
|||
Line 18: | Line 18: | ||
Check channels in histograms | Check channels in histograms | ||
+ | |||
+ | |||
+ | Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs | ||
+ | |||
+ | TDC start: Accelerator RF pulse generator. | ||
+ | TDC stop: 2 DC, 1 GEM trigout, 4 PMTs | ||
+ | |||
+ | ADC: all FC channels from Accelerator ribbon cable. | ||
+ | ADC gate: Create timing gate using scope when accelerator | ||
+ | |||
+ | V1495: Trigger pulse from coincidence logic above | ||
=3/22/10= | =3/22/10= |
Revision as of 00:25, 20 March 2010
HRRL run on March 22-26 2010
Preliminary setup
3/17/10
Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table.
Install collimation
3/18/10
Install all detectors and associated electronics (power supplies, cabling, gas lines,...)
3/19/10
install DAQ system and associated readout electronics.
Check channels in histograms
Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs
TDC start: Accelerator RF pulse generator. TDC stop: 2 DC, 1 GEM trigout, 4 PMTs
ADC: all FC channels from Accelerator ribbon cable. ADC gate: Create timing gate using scope when accelerator
V1495: Trigger pulse from coincidence logic above
3/22/10
Final day for completing system checks
3/23/10
1pm - 5pm: Tune beam for low and high current