Difference between revisions of "Sadik Log Book"

From New IAC Wiki
Jump to navigation Jump to search
Line 55: Line 55:
 
move magnet power supplies to Accelerator operator post   
 
move magnet power supplies to Accelerator operator post   
  
install wiring for at least 2 quads in the HRRL which you will use for emmittance test
+
Map quads
  
 
need to design beamline for test
 
need to design beamline for test
  
Map quads
+
install wiring for at least 2 quads in the HRRL which you will use for emmittance test
 +
 
  
 
2.) Simulation
 
2.) Simulation

Revision as of 21:58, 4 June 2010

2010-02-24

Go to IAC research facility near airport collect:

1) 2 Q1B, 3 Quad2T, 6 Quad2A.

2) 2 KiwiDipole

3) Power supplies: 110 V is preferred, at lest 3, at most 13 (one for each magnet). Need to test before taking, see if they work.


Check for the link IAC_positron_beamline for magnets and power supplies descriptions.

2010-02-25

All on the list of 2010-02-24 are in physics beam lab, except 6 Quad2A which will be delivered by IAC research assistant Dillon tomorrow morning.

Next step is to test these power supplies see if they work.

2010-03-13-14

Measure magnetic field strength as function of current dB/dI.

1) Type 1 Quad (also Quad2A )


2) Type 2 Quad (also Quad2T )


2010-03-27

Measurement on magnetic field strength as function of current dB/dI were done. And Fitting function for was data created.

1) Type 1 Quad (also Quad2A )

2) Type 2 Quad (also Quad2T )

done: http://wiki.iac.isu.edu/index.php/Instruments_and_Equipments

2010-05-17

Need to simulation on HRRL radiation. Place a cylindrical detector near corner of the wall 1 measure total photon and electron energy deposited. In simulation, place cylindrical lead (Pb) shield around HRRL, and see the change on the energy, if I change the thickness of that shield. This need to be done for both new and old (original) position of HRRL, so I can compare the ratio of the total energy deposited (electron and photon energy mixed) in new position to old position. Propose of this simulation is by comparing energy ratio, we have idea of radiation dose will be deposited on the cylindrical detector near the corner of wall 1.


2010-05-20

http://wiki.iac.isu.edu/index.php/HRRL_CHIPS_Logbook#5.2F20.2F10


2010-06-04

1.)Emmittance measurement.

move magnet power supplies to Accelerator operator post

Map quads

need to design beamline for test

install wiring for at least 2 quads in the HRRL which you will use for emmittance test


2.) Simulation

3.)Calculate impact of beam on Tungsten target in Vacuum

HRRL_Postron_Rotating_W_Target

Go back to User:Sadik82