HRRL CHIPS Logbook: Difference between revisions
Jump to navigation
Jump to search
Created page with '=10/29/09= Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE. 1.) Ask Mark Balzer to submit a r...' |
|||
| Line 5: | Line 5: | ||
1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken. | 1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken. | ||
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design. | 2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in [http://wiki.iac.isu.edu/index.php/Beamline_design_%28G._Stancari%29 Stancari's design]. | ||
[[Positrons]] | |||
Revision as of 17:11, 29 October 2009
10/29/09
Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE.
1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design.