HRRL CHIPS Logbook: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Oborn (talk | contribs)
Created page with '=10/29/09= Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE. 1.) Ask Mark Balzer to submit a r...'
 
Oborn (talk | contribs)
Line 5: Line 5:
1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.
1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.


2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design.
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in [http://wiki.iac.isu.edu/index.php/Beamline_design_%28G._Stancari%29 Stancari's design].
 
 
[[Positrons]]

Revision as of 17:11, 29 October 2009

10/29/09

Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE.

1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.

2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design.


Positrons