Difference between revisions of "HRRL 4-13-09"

From New IAC Wiki
Jump to navigation Jump to search
Line 29: Line 29:
 
|4/17/09 || Run HRRL from 9 am til 5 pm finish detector tracking studies
 
|4/17/09 || Run HRRL from 9 am til 5 pm finish detector tracking studies
 
|}
 
|}
 +
 +
=4/13/09=
 +
 +
 +
 +
==Electron Dose tests==
 +
 +
 +
==GEM noise==
 +
===GEM in Accelerator room===
 +
 +
=== GEM in HRRL exp cell ===
 +
 +
 +
 
[http://wiki.iac.isu.edu/index.php/Qweak Go Back] [[Qweak]]
 
[http://wiki.iac.isu.edu/index.php/Qweak Go Back] [[Qweak]]

Revision as of 20:19, 13 April 2009

Default HRRL running Conditions

[math]I_{peak}[/math] Pulse Width Rep Rate Energy
8 mA 25 ns 1 Hz 3 MeV


run plan

Date Task
4/11/09 Install Motion Sliders
4/12/09 Install DAQ and Drift chambers
4/13/09 Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak)
4/14/09 Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak), Do Plateau measurements and test readout
4/15/09 Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM
4/16/09 Run HRRL from 2 pm til 5 pm, efficiency tests
4/17/09 Run HRRL from 9 am til 5 pm finish detector tracking studies

4/13/09

Electron Dose tests

GEM noise

GEM in Accelerator room

GEM in HRRL exp cell