Difference between revisions of "NEUPRFP 2009"
Line 56: | Line 56: | ||
==R&D resources and Capabilities (10% or 1.5 pages)== | ==R&D resources and Capabilities (10% or 1.5 pages)== | ||
+ | [[Image:hrrl.jpg|thumb|hrrl]] | ||
+ | |||
+ | [[Image:countroom.jpg|thumb|count room]] | ||
HRRL description (with specs and picture) | HRRL description (with specs and picture) | ||
Line 105: | Line 108: | ||
[[Image:hrrl_valeriia_3.jpg|thumb| experimental cell closeup. Need to fix the e+/e- orbits to look the same. One of the particles will remain in the B-field while the other escapes.]] | [[Image:hrrl_valeriia_3.jpg|thumb| experimental cell closeup. Need to fix the e+/e- orbits to look the same. One of the particles will remain in the B-field while the other escapes.]] | ||
− | |||
− | |||
− | |||
− |
Revision as of 21:59, 25 February 2009
A PDF version of the RFP is given below
- Proposal Due date
- March 16,2009
Guidelines
Go/NoGo requirements
- Commitment to reporting
- If DOE Lab Work and safety Health program
- Export Control
- Standard Research Subcontract
- Quality Assurance if non-academic partner
- commitment to prepare additional contracts
Proposal Outline
Title:
Technical Work Scope and Mission Relevance (20% or 3 pages)
(D.Dale)
Proposed scope description and Scientific Merit (20% or 3 pages)
(D.Dale)
Research Plan Tasks to accomplish scope (35% or 5 pages)
1. establish and commission beamline for polarized photons 2. proof in principle asymm measurement 3. applications: variable targets
(D.Dale)
Milestones and Deliverables
12 months after: acquire beamline components (vacuum pipe for beam dump, beam dump magnet, exit window/pair converter, radiator, 4 PMTs+ bases, octal discriminators, 4-fold logic unit)
24 months after: commission beamline; begin measurements
36 months after: report on measurements with application assessment
R&D resources and Capabilities (10% or 1.5 pages)
HRRL description (with specs and picture) counting room (with picture)
(V.S.- pictures + T.Forest - description)
Timeline
year 1: establish beamline
year 2:
year 3:
(D.Dale)
Roles of Participants and Team Qualifications (15% or 2 pages)
Participant A = D.Dale = Manager Photofission physics
Participant B = V. Starovoitova = Data analysis expert
Participant C = T. Forest = DAQ, beam line design
Participant D = P. Cole = beamline instrumentation, expert complainer
Students = 2 PhD theses + 2 MS theses, 2 undergrad training
Work Scope Challenges and expected innovations
Documentation procedures
Quality Assurance
Budget form
(V.S. + CV)