Difference between revisions of "NEUPRFP 2009"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
==Milestones and Deliverables== | ==Milestones and Deliverables== | ||
− | 12 months after: acquire | + | 12 months after: acquire beamline components (vacuum pipe for beam dump, beam dump magnet, exit window/pair converter, radiator, 4 PMTs+ bases, octal discriminators, 4-fold logic unit) |
− | |||
− | |||
− | |||
+ | 24 months after: commission beamline; begin measurements | ||
+ | 36 months after: report on measurements with application assessment | ||
==R&D resources and Capabilities== | ==R&D resources and Capabilities== |
Revision as of 23:40, 24 February 2009
A PDF version of the RFP is given below
- Proposal Due date
- March 16,2009
Go/NoGo requirements
- Commitment to reporting
- If DOE Lab Work and safety Health program
- Export Control
- Standard Research Subcontract
- Quality Assurance if non-academic partner
- commitment to prepare additional contracts
Proposal Outline
Title:
Technical Work Scope and Mission Relevance
Proposed scope description and Scientific Merit
Research Plan Tasks to accomplish scope
Milestones and Deliverables
12 months after: acquire beamline components (vacuum pipe for beam dump, beam dump magnet, exit window/pair converter, radiator, 4 PMTs+ bases, octal discriminators, 4-fold logic unit)
24 months after: commission beamline; begin measurements
36 months after: report on measurements with application assessment
R&D resources and Capabilities
Timeline
year
1: establish beamline 2: 3:
Roles of Participants and Team Qualifications
Participant A = D.Dale = Manager Photofission physics Participant B = V. Starovoitova = Data analysis expert Participant C = T. Forest = DAQ, beam line design Participant D = P. Cole = beamline instrumentation, expert complainer
Students = 2 PhD theses + 2 MS theses, 2 undergrad training