Difference between revisions of "Qweak TaskList"
Jump to navigation
Jump to search
| Line 37: | Line 37: | ||
| | | | ||
| Quick Release GEM detector to rotator attachment system | | Quick Release GEM detector to rotator attachment system | ||
| + | |- | ||
| + | | 8/27/07 | ||
| + | | | ||
| + | | VFAT control and Monitoring Web interface | ||
|} | |} | ||
[http://wiki.iac.isu.edu/index.php/Qweak Go Back] [[Qweak]] | [http://wiki.iac.isu.edu/index.php/Qweak Go Back] [[Qweak]] | ||
Revision as of 04:48, 25 January 2009
Remaining tasks for installing R1.
| Start Date | Status | Task |
| HV test Qweak detector | ||
| 11/14/09 | done | Measure GEM trigout rates -vs- HV |
| Measure GEM tracking resolution | ||
| Measure GEM QE and uniformity | ||
| Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA) | ||
| Hit Pattern GUI from V1495 output | ||
| HV remote control software (steve wood has solution we need to copy) | ||
| Quick Release GEM detector to rotator attachment system | ||
| 8/27/07 | VFAT control and Monitoring Web interface |