Tasks:

1.) Run Tables (Alex)

2.) ASCII file generation Sam)

3.) TDC -> time -> Neutron Energy calibration (Sadiq)

4.) Reproducibility tests (Dale, Alex)

a.) Gamma & Neutron rate change

b.)NaI/Ref -vs run number and Target (Wheres de photons)

c.) Asym the same between detectors in same run and same detector in different runs

5.) Threshold match procedure (Tony)

Did the unpolarized runs on the last day have matched thresholds?

Compare Asym in single run to asym when detectors swapped

6.) H20,C,Si,Pb,N([math]\gamma[/math],n), X-sections Neutron producers? (jason, Ariel, Sam)

Black lead shot collimator increased neutron flux by factor 2?

7.) Origin curve Fitting (Valeriia)

8.) U rate estimate (Dale)

9.) Asym -vs TDC (MeV)

10.) What improvement in beam is needed

11.) FFT of N ToF