Difference between revisions of "PhotoFissionOctoberAnalysis"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
b.) | b.) | ||
+ | |||
+ | 5.) Threshold match procedure | ||
+ | |||
+ | Did the unpolarized runs on the last day have matched thresholds? | ||
+ | |||
+ | Compare Asym in single run to asym when detectors swapped |
Revision as of 15:38, 28 October 2008
10/28/08
Tasks:
1.) Run Tables
2.) ASCII file generation
3.) TDC -> time -> Neutron Energy calibration
4.) Reproducibility tests
a.) Gamma rate change
b.)
5.) Threshold match procedure
Did the unpolarized runs on the last day have matched thresholds?
Compare Asym in single run to asym when detectors swapped