Difference between revisions of "Uranium target test"

From New IAC Wiki
Jump to navigation Jump to search
Line 7: Line 7:
 
On the picture: 1D - timing spectrum taken by upper detector, 1C - timing spectrum taken by side detector, 1A - timing spectrum taken by side reference (being kept stationary) detector, 1B - NaI accelerator current monitor
 
On the picture: 1D - timing spectrum taken by upper detector, 1C - timing spectrum taken by side detector, 1A - timing spectrum taken by side reference (being kept stationary) detector, 1B - NaI accelerator current monitor
  
The target is replaced by small cylindrical jar...
+
The target needs to be replaced by a small cylindrical target
 
 
 
[http://www.iac.isu.edu/mediawiki/index.php/October_Fission_HRRL_Measurements_2008 Go Back]
 
[http://www.iac.isu.edu/mediawiki/index.php/October_Fission_HRRL_Measurements_2008 Go Back]

Revision as of 17:28, 20 October 2008

First, a uranium plate is used, dimentions (approximately): 15cm x 12.5 cm x 3.5 mm


Uranium.jpg

On the picture: 1D - timing spectrum taken by upper detector, 1C - timing spectrum taken by side detector, 1A - timing spectrum taken by side reference (being kept stationary) detector, 1B - NaI accelerator current monitor

The target needs to be replaced by a small cylindrical target Go Back