Difference between revisions of "Qweak R1 Proj Management"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
=Man Power= | =Man Power= | ||
− | + | == JLAB tests== | |
+ | |||
+ | The hope is to test the R1 detector during the Summer of 2009 at JLAB with a setup identical to what will be used in the Hall. This means having the all cables in place (with the proper lengths) to test timing. We need CODA setup with a VME crate that has a V1495 in it for readout. We need the scintillator for triggering. Paul King won't be available until after Mid June. | ||
+ | |||
+ | |||
+ | ==Commissioning shifts== | ||
+ | |||
+ | These shifts wil take place during the Qweak comissioning phase | ||
+ | |||
# Tracking shifts | # Tracking shifts | ||
#Writing the tracking document for shift takers. | #Writing the tracking document for shift takers. |
Revision as of 12:17, 29 July 2008
Project Leaders
Detector and Front End Electronics
Back End Electronics and Rotator
Man Power
JLAB tests
The hope is to test the R1 detector during the Summer of 2009 at JLAB with a setup identical to what will be used in the Hall. This means having the all cables in place (with the proper lengths) to test timing. We need CODA setup with a VME crate that has a V1495 in it for readout. We need the scintillator for triggering. Paul King won't be available until after Mid June.
Commissioning shifts
These shifts wil take place during the Qweak comissioning phase
- Tracking shifts
- Writing the tracking document for shift takers.
Timeline
Date Milestone Description