Difference between revisions of "Qweak Installation"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
The numbers below are just a Guess with no justification from a simulation or hand calculation. | The numbers below are just a Guess with no justification from a simulation or hand calculation. | ||
− | Tolorance for GEM relative to the | + | Tolorance for GEM relative to the PRIMARY COLLIMATOR (2nd collimator) |
+ | |||
+ | Survey can pretend to do 50 micron resolution 200 micron resolution is no problem. | ||
+ | |||
+ | Survey marker tooling balls need 1/4 inch rods to mount prisms on. Should have at least 3, 1/4 holes. | ||
Revision as of 12:40, 28 July 2008
Information for installing the R1 chambers into Hall C
Target Installation Date
The target date to install the R1 chambers in Hall C is
Definitions
- Survey tolorance
- The accuracy in the absolute location of an object
- Alignment Tolerance
- The accuracy of an object relative some other known object.
- "Would like to"
- desired alignment accuracy
- "Must have"
- Required alignment accuracy
- "Known to"
- desired survey accuracy
Tolorances
The charge collector strips are less than 0.4 mm wide. The concentric strips can give you a direct measurement of the electron scattering angle
if they are properly alignment with the beam line.
The numbers below are just a Guess with no justification from a simulation or hand calculation.
Tolorance for GEM relative to the PRIMARY COLLIMATOR (2nd collimator)
Survey can pretend to do 50 micron resolution 200 micron resolution is no problem.
Survey marker tooling balls need 1/4 inch rods to mount prisms on. Should have at least 3, 1/4 holes.
Coordinate | "Would like to" | "Must have" | Known to |
(mm) | (mm) | (mm) | |
X | 0.2 | 0.4 | 0.2 |
Y | 0.2 | 0.4 | 0.2 |
Z | 1 | 10 | 1 |
Yaw(about Y) | |||
Pitch (about X) | |||
Roll(about Z) |