Difference between revisions of "CHIPS Run May-2008"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
  
 
=Goals=
 
=Goals=
Line 26: Line 25:
 
2.) minimize background
 
2.) minimize background
  
3.) show the gamma is from positrons buy doing Tantalum target in -vs- out measuremnts.
+
3.) show the gamma is from positrons buy doing Tantalum target in -vs- out measurments.
  
 +
==May 29, 2008 ==
  
 
+
Measure 0.511 keV gammas as a function of beam current
==May 29, 2008 ==
 
  
  
 
==May 30, 2008 ==
 
==May 30, 2008 ==
 
Measure 0.511 keV gammas as a function of beam current
 
  
 
Solvable Problems:
 
Solvable Problems:

Revision as of 15:58, 22 May 2008

Goals

  1. Determine smallest beam spot size using JLAB flags at the zero degre port and after the 90 degree bend on the 25 MeV machine current beam line
  2. Install FC and measure its performance (smallest controllable current attainable)
  3. Measure background rates for positron production

Run Plan

May 27,2008

Spend Day tuning with the following goals

1.) Minimize beam spot size on zero port and document with image grabber. 1 mm diameter beam spot size is the goal. 2.) Check spot size on flag after 90 degree bend. Tungsten target out 3.) Try to retune the beam spot after the 90 degree bend to a 1mm diameter 4.) Optimize transmission to FC.

5.) loop over 1-4 to find tune which delivers highest transmission and smallest beam spot size.

May 28, 2008

1.) turn on NaI and HpGe detectors.

2.) minimize background

3.) show the gamma is from positrons buy doing Tantalum target in -vs- out measurments.

May 29, 2008

Measure 0.511 keV gammas as a function of beam current


May 30, 2008

Solvable Problems:

1.) JLAB would like beam spot of 1 mm. Measured 8 mm after thick window. Doug reported measuring 3 mm without thick window.

2.) Lowering beam current: 10^8 electrons/pulse desired to produce 1 positron per pulse. Perhaps slits can solve the above problems and then localized lead shielding to reduce backgrounds.

3.) Beam position monitoring. Flags from JLab have arrived Brett will look into installing.

May run on IAC schedule for 27,28,29,30
need cameras for the flags.

Next steps after Feb run:

1.) Optimize develop beam line design. Serkan needs more input about the IAC beam properties.

2.)Proposal is to measure beam properties with flags and FCUP during May 27-30 run. (parts to install beam line flags is critical path defining the run start date).

   a.)Measure beam shape at zero degree port and after 90 degree bend
   b.) install FCUP (2 3/4 flange)
   c.) measure background rates
 
      i.) one flag has positron converter in experimental cell.
      ii.) dipole on experimental cell side
      iii.) photon veto using scintillators


3.) Future beam line

 a.) perhaps move converter target between dipole
 b.) 50 ns beam pulse may give you +/- 2 MeV spread


Targets

1.) Tantalum foil 2.0 mm (99.5% metals basis) lot # D11S010, stock # 10357

2.) Tungsten foil, 1.0 mm thick, 99.5% metals basis, LOT # H23R015, stock #13981


Phosphorus targets:

3.5 cm center to center distance between mount bolts.


Go back