+ | Decided to increase beam current until up to 10% of events in front scintilaltor hit back scintillator. Ran in OR mode so a software coincidence can be formed based on measurement in ADC15 (ADC14 in C convention). | ||
+ | |||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
|- | |- |
Revision as of 16:36, 29 February 2008
Leap Day run
DC setup
This time the Sense wire HV is set to 1500 to start
90/10 ArCo2
HV settings | ||
Wire | Volts | current ( | A)
Sense | 1500 | |
Field | -750 | |
Guard | 750 |
DC preamp at 5.6 Volts
Beam Line Configuration
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.
Increased beam energy from 10 MeV to 12 MeV due to expected energy loss in front scintillator.
Runs
Decided to increase beam current until up to 10% of events in front scintilaltor hit back scintillator. Ran in OR mode so a software coincidence can be formed based on measurement in ADC15 (ADC14 in C convention).
Run # | Description |
431 | 0" from feedthrough , Sense wire at 1450 Volts |
432 | 0" from feedthrough , Sense wire at 1500 Volts |