Difference between revisions of "IAC 2-29-08"
Jump to navigation
Jump to search
(→Runs) |
|||
Line 28: | Line 28: | ||
= Runs= | = Runs= | ||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | | Run # || Description | ||
+ | |- | ||
+ | |480|| | ||
+ | |- | ||
+ | |} |
Revision as of 15:24, 29 February 2008
Leap Day run
DC setup
This time the Sense wire HV is set to 1500 to start
90/10 ArCo2
HV settings | ||
Wire | Volts | current ( | A)
Sense | 1500 | |
Field | -750 | |
Guard | 750 |
DC preamp at 5.6 Volts
Beam Line Configuration
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.
Runs
Run # | Description |
480 |