Difference between revisions of "IAC 2-29-08"

From New IAC Wiki
Jump to navigation Jump to search
Line 28: Line 28:
  
 
= Runs=
 
= Runs=
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
| Run # || Description
 +
|-
 +
|480||
 +
|-
 +
|}

Revision as of 15:24, 29 February 2008

Leap Day run

DC setup

This time the Sense wire HV is set to 1500 to start

90/10 ArCo2

HV settings
Wire Volts current ([math]\mu[/math]A)
Sense 1500
Field -750
Guard 750

DC preamp at 5.6 Volts


Go Back

Beam Line Configuration

A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.

Runs

Run # Description
480