Difference between revisions of "RUN 62"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
<math>P_B = 5.05 Torr</math>, trigger <math>T_1</math> & <math>T_2</math>, time [determined] by <math>T_1</math>, NO beam
+
<math>P_B = 5.05 Torr</math>, trigger <math>T_1</math> & <math>T_2</math>, time [determined] by <math>T_1</math>, NO beam, <math>N_{Tr} = 48</math>
 +
 
 +
Pressure icreased, <math>N_{Tr}</math> decreased: <math>N_{Tr} = 40 Hz</math>

Revision as of 23:51, 13 January 2008

[math]P_B = 5.05 Torr[/math], trigger [math]T_1[/math] & [math]T_2[/math], time [determined] by [math]T_1[/math], NO beam, [math]N_{Tr} = 48[/math]

Pressure icreased, [math]N_{Tr}[/math] decreased: [math]N_{Tr} = 40 Hz[/math]