Difference between revisions of "IAC 1-7-08"
Line 28: | Line 28: | ||
We will move the Aluminum brick in front of the first scintillator. | We will move the Aluminum brick in front of the first scintillator. | ||
+ | |||
+ | |||
+ | Aluminum block in front of first scintillator between experimental side wall and large scintillator. | ||
+ | |||
Rates: | Rates: | ||
:First PMT singles =6128/2 min = 3064/min | :First PMT singles =6128/2 min = 3064/min | ||
Line 33: | Line 37: | ||
:PMT Coinc Both PMTs & Metallica DC =3/2min = 1.5/min | :PMT Coinc Both PMTs & Metallica DC =3/2min = 1.5/min | ||
+ | Now take the brick out. | ||
− | + | Rates: | |
+ | :First PMT singles = min = /min | ||
+ | :PMT Coinc both PMTs= min = /min | ||
+ | :PMT Coinc Both PMTs & Metallica DC =min = /min | ||
[http://www.iac.isu.edu/mediawiki/index.php/Mini-prototype#IAC_Runs Go Back] | [http://www.iac.isu.edu/mediawiki/index.php/Mini-prototype#IAC_Runs Go Back] |
Revision as of 21:33, 7 January 2008
Accelerator: 100 ns, 60 Hz, 15 MeV
Configuration: Collimated rear scint + 2" Aluminum brick
Rates:
- Coinc both PMTs =484/4min = 121/min
- PMT Coinc Both PMTs & Metallica DC =25/4min = 6/min
Configuration: Collimated rear scint
Rates:
- PMT Coinc both PMTs = 308/2min = 154/min
- PMT Coinc Both PMTs & Metallica DC =17/2min = 8/min
The ratio of double/triple =36/1054 = 3.1%
Configuration: Collimated rear scint+ 2" Aluminum brick + 2" lead brick
Rates:
- PMT Coinc both PMTs=105/10min = 10/min
- PMT Coinc Both PMTs & Metallica DC =4/10min = 0.5/min
We see a lot of events in the Scintillator and very few in the Chamber. There is no clear electron signal so let's debug the beamline.
Our tests on Friday showed that inserting an Aluminum brick in front of our first collimator decreased the first scintillator's count rate by approximately 60 %. A 15 MeV electron should stop in 2cm of Aluminum. We believe our 2" (5 cm) thick Aluminum brick will stop electrons but not photons. We do not observed the same change in rate when we insert the Aluminum brick in front of the rear scintillator. We believe our collimation system is blocking most of the electrons.
We will move the Aluminum brick in front of the first scintillator.
Aluminum block in front of first scintillator between experimental side wall and large scintillator.
Rates:
- First PMT singles =6128/2 min = 3064/min
- PMT Coinc both PMTs=132/2 min = 66/min
- PMT Coinc Both PMTs & Metallica DC =3/2min = 1.5/min
Now take the brick out.
Rates:
- First PMT singles = min = /min
- PMT Coinc both PMTs= min = /min
- PMT Coinc Both PMTs & Metallica DC =min = /min