Difference between revisions of "IAC positron beamline"

From New IAC Wiki
Jump to navigation Jump to search
Line 14: Line 14:
 
Label on side of Dipole 2
 
Label on side of Dipole 2
  
[[Image:IAC_25MeV_Dipole2_Label_11-08-07.jpg | 200 px ]]
+
[[Image:IAC_25MeV_Dipole2_Label_11-08-07.jpg | 50 px ]]

Revision as of 18:21, 9 November 2007

This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2. Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.


IAC 25MeV 90DegreeBend 11-08-07.jpg

The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..

IAC 25MeV Dipole1 11-08-07.jpg

Label on side of Dipole 1

IAC 25MeV Dipole1 Label 11-08-07.jpg

Label on side of Dipole 2

IAC 25MeV Dipole2 Label 11-08-07.jpg