Difference between revisions of "IAC positron beamline"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
− | [[Image:IAC_25MeV_Dipole1_Label_11-08-07.jpg | 400 px]] | + | [[Image:IAC_25MeV_Dipole1_Label_11-08-07.jpg | 400 px rot 90]] |
Revision as of 18:14, 9 November 2007
This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2. Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.
The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..