Difference between revisions of "IAC positron beamline"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 2: Line 2:
  
  
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg]]
+
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg | 400 px]]
  
 
The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..
 
The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..
  
[[Image:IAC_25MeV_Dipole1_11-08-07.jpg]]
+
[[Image:IAC_25MeV_Dipole1_11-08-07.jpg | 400 px]]
  
  
[[Image:IAC_25MeV_Dipole1_Label_11-08-07.jpg]]
+
[[Image:IAC_25MeV_Dipole1_Label_11-08-07.jpg | 400 px]]

Revision as of 18:08, 9 November 2007

This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (Dipole 2) begins after Quad 1 and Quad 2. Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.


IAC 25MeV 90DegreeBend 11-08-07.jpg

The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..

IAC 25MeV Dipole1 11-08-07.jpg


IAC 25MeV Dipole1 Label 11-08-07.jpg