Difference between revisions of "CLAS12 R1"
Line 24: | Line 24: | ||
Environmental control | Environmental control | ||
− | Temperature constraint is <math>\pm 2\% :\frac{7\% \;\;change\;\;in \;\;tension}{6 \;\;Degree \;\; Farenheit}</math> | + | Temperature control constraint is <math>\pm 2\% :\frac{7\% \;\;change\;\;in \;\;tension}{6 \;\;Degree \;\; Farenheit}</math> |
Humidity control: 55\% or less | Humidity control: 55\% or less |
Revision as of 08:22, 3 June 2008
IAC Facility
16' high 26 ' deep 17 ' wide
ODUs current clean room size:
16' high 26 ' deep 17 ' wide
Door:
9'8" high 12' wide
Below is a picture of the current conference room at the IAC which will be removed and replaced with a clean room very similar in design to ODU's.
Environmental control
Temperature control constraint is
Humidity control: 55\% or less
R1 Construction preparations
Discussion items
1.) Budget
- JLab to ISU travel for JLab personnel to inspect operations
- shipping container for R1 chambers
2.) Clean room
cost =
assume we copy the ODU clean room
Using IAC conference room space, need to remove carpet and paint floor.
3.) hiring timeline
9/08 NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.) Stringing equipment
a.) crimping tool
b.) glue
c.) wire or feedthroughs?
d.) wire tension measurement (PC, Magnets, associated electronics
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07
The air actuated crimping tool: