Difference between revisions of "CLAS12 R1"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
=R1 Construction preparations=
 +
 +
1.) Budget
 +
 +
2.) Clean room
 +
 +
3.) hiring timeline
 +
 +
 +
9/08  NSF proposal submission
 +
 +
 +
4.) stringing platform and DC stringing support arm
 +
 +
5.) Manpower
 +
 +
6.) MOU to support post doc request or faculty release time
 +
 +
7.)
 +
 +
 +
 +
 
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07.  It is about 6 feet tall.
 
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07.  It is about 6 feet tall.
 
[[CLAS12_R1_Prototype_9-16-07]]
 
[[CLAS12_R1_Prototype_9-16-07]]

Revision as of 14:45, 2 June 2008

R1 Construction preparations

1.) Budget

2.) Clean room

3.) hiring timeline


9/08 NSF proposal submission


4.) stringing platform and DC stringing support arm

5.) Manpower

6.) MOU to support post doc request or faculty release time

7.)



A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07

The air actuated crimping tool:

Air Actuated R1 CrimpingTool.jpg


CLAS12_R1_Prototype_2-20-08