Difference between revisions of "Group Meetings"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
*Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it. | *Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it. | ||
*Password change has started | *Password change has started | ||
− | * | + | *Optical link to control rack will occur during september upgrades |
==Friday July 13th 2007== | ==Friday July 13th 2007== |
Revision as of 01:25, 10 August 2007
Friday August 10th 2007
- Items to discuss:
- New network ports
- Origin licensing
- Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM)
Friday July 27th 2007
- Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it.
- Password change has started
- Optical link to control rack will occur during september upgrades
Friday July 13th 2007
- First meeting.
- Made a list of current issues that can be found here List of Current Issue.
- Decided to meet every other week after the IAC staff meeting.