Difference between revisions of "Group Meetings"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
**Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM) | **Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM) | ||
==Friday July 27th 2007== | ==Friday July 27th 2007== | ||
− | * | + | *Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it. |
+ | *Password change has started | ||
+ | *OPtical link to control rack will occur during september upgrades | ||
==Friday July 13th 2007== | ==Friday July 13th 2007== |
Revision as of 16:51, 4 August 2007
Friday August 10th 2007
- Items to discuss:
- New network ports
- Origin licensing
- Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM)
Friday July 27th 2007
- Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it.
- Password change has started
- OPtical link to control rack will occur during september upgrades
Friday July 13th 2007
- First meeting.
- Made a list of current issues that can be found here List of Current Issue.
- Decided to meet every other week after the IAC staff meeting.