Difference between revisions of "DOE EPSCoR Proposal"

From New IAC Wiki
Jump to navigation Jump to search
Line 7: Line 7:
  
 
== Year 2 ==
 
== Year 2 ==
# Use Genetic algoithm with Simulation predictions to optimize positron production
+
# Use Genetic algorithm with Simulation predictions to optimize positron production
# CEBAF can accept particles into acceleration stage as long as <math>\frac{\Delta E}{E} \leq 10^{-5}</math>
+
# Begin designing tungsten converter capable of handling high heat load
 +
#CEBAF can accept particles into acceleration stage as long as <math>\frac{\Delta E}{E} \leq 10^{-5}</math>
  
 
== Year 3 ==
 
== Year 3 ==

Revision as of 00:46, 14 June 2007

A Positron Source for JLAB

Year 1

  1. Check positron productions efficiency simulations for 10-20 MeV electrons on Tungsten Target
  2. Measure positron emmitance and compare to simulation predictions
  3. Repeat above measurements at different tilt angles

Year 2

  1. Use Genetic algorithm with Simulation predictions to optimize positron production
  2. Begin designing tungsten converter capable of handling high heat load
  3. CEBAF can accept particles into acceleration stage as long as [math]\frac{\Delta E}{E} \leq 10^{-5}[/math]

Year 3