Difference between revisions of "CH Weekly Reports"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* Calculated ADC dead time for live-time correction to efficiency measurement count rates. | * Calculated ADC dead time for live-time correction to efficiency measurement count rates. | ||
− | + | * Designed holder for Gd foils needed for CaGaS Phase II experiment. To be 3D printed and tested for tolerances. | |
='''Previous Page'''= | ='''Previous Page'''= | ||
[[PAS Experiment]] | [[PAS Experiment]] |
Revision as of 20:19, 22 September 2022
09/19/22
- Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements.
- Modified existing calibration code to use non-linear regression to account for ADC.
- Sourced material needed for CaGaS Phase II setup.
- Calculated ADC dead time for live-time correction to efficiency measurement count rates.
- Designed holder for Gd foils needed for CaGaS Phase II experiment. To be 3D printed and tested for tolerances.