Difference between revisions of "CH Weekly Reports"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
* Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements. | * Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements. | ||
− | * Modified existing calibration code to use non-linear regression to account for ADC | + | * Modified existing calibration code to use non-linear regression to account for ADC. |
− | * Sourced material needed for CaGaS Phase II setup | + | * Sourced material needed for CaGaS Phase II setup. |
− | * Calculated ADC dead time for live-time correction to efficiency measurement count rates | + | * Calculated ADC dead time for live-time correction to efficiency measurement count rates. |
Revision as of 19:18, 22 September 2022
09/19/22
- Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements.
- Modified existing calibration code to use non-linear regression to account for ADC.
- Sourced material needed for CaGaS Phase II setup.
- Calculated ADC dead time for live-time correction to efficiency measurement count rates.