Difference between revisions of "PAS Feasibility Preliminary Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 20: Line 20:
 
! Source Distance from Intersection (cm) !! Counts !! Run Time (s) !! Count Rate (Hz) !! Uncertainty ||
 
! Source Distance from Intersection (cm) !! Counts !! Run Time (s) !! Count Rate (Hz) !! Uncertainty ||
 
|-
 
|-
| 39.5 || || 100 ||  ||  
+
| 39.5 || 1563 || 100 ||  ||  
 
|-
 
|-
 
|  ||  || 100 ||  ||
 
|  ||  || 100 ||  ||

Revision as of 19:38, 19 July 2021

This experimental setup does not contain BorAl

General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector

7/19/21

NaI Detector, 5mV threshold, +1000V on detector, no converter

Source Distance from Intersection (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 1563 100
100
100

NaI Detector, 5mV threshold, +1000V on detector, with converter

Source Distance from Intersection (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 100
100
100




PAS Feasibility Study Runs