Difference between revisions of "PAS Thermalizing Box Design"
Jump to navigation
Jump to search
(→Lead) |
|||
Line 57: | Line 57: | ||
* 2X (2" x 2" x 6") | * 2X (2" x 2" x 6") | ||
− | =Lead= | + | ='''Lead'''= |
50 lead bricks | 50 lead bricks |
Revision as of 16:22, 19 July 2021
3D Models
For all models:
- Red - Lead brick
- White - Regular poly
- Green - Borated Poly
7/6/21
This design is preliminary and subject to change. No BorAl shielding has been included.
7/12/21
7/14/21
Poly Bricks for Setup
Poly Base
- 4X (4" x 2" x 6")
- 2X (4" x 2" x 7")
Poly Outside Wall
- 1X (4" x 2" x 7")
- 1X (4" x 2" x 6")
- 2X (4" x 2" x 8")
Poly Inside Wall
- 1X (4" x 2" x 3")
- 1X (4" x 2" x 8")
- 2X (4" x 2" x 6")
Poly Top
- 2X (4" x 2" x 7")
- 3X (4" x 2" x 6")
- 2X (2" x 2" x 6")
Lead
50 lead bricks
- (49) 4" x 1" x 8"
- (1) 4" x 2" x 8"
BorAl
Needs to be calculated based off of new setup