Difference between revisions of "PAS Feasibility Preliminary Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
'''This experimental setup does not contain BorAl'''
 
'''This experimental setup does not contain BorAl'''
  
General run plan
+
='''General run plan'''=
  
 
* Run source in and source out in experimental setup and background subtract with NaI
 
* Run source in and source out in experimental setup and background subtract with NaI
Line 12: Line 12:
  
 
I will upload some models of the setup when I have updated the model to include the source and detector
 
I will upload some models of the setup when I have updated the model to include the source and detector
 +
 +
=='''7/19/21'''==
 +
 +
{| class="wikitable"
 +
|+ NaI Detector, 5mV threshold, +1000V on detector
 +
|-
 +
! Source Distance from Intersection (cm) !! Counts !! Run Time (s) !! Count Rate (Hz) !! Uncertainty
 +
|-
 +
| 39.5 ||  ||  ||  ||
 +
|-
 +
| Example || Example || Example
 +
|-
 +
| Example || Example || Example
 +
|}
 +
 +
  
  

Revision as of 19:33, 19 July 2021

This experimental setup does not contain BorAl

General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector

7/19/21

NaI Detector, 5mV threshold, +1000V on detector
Source Distance from Intersection (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5
Example Example Example
Example Example Example





PAS Feasibility Study Runs