PAS Feasibility Preliminary Runs: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Harpconn (talk | contribs)
No edit summary
Line 9: Line 9:
** Move the source to different locations along the source tunnel and plot the different distances and count rates
** Move the source to different locations along the source tunnel and plot the different distances and count rates


*Run source in and source out in experimental setup and background subtract with He3
* Run source in and source out in experimental setup and background subtract with He3


** Move the source to different locations along the source tunnel and plot the different distances and count rates
** Move the source to different locations along the source tunnel and plot the different distances and count rates

Revision as of 15:35, 17 July 2021

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
    • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
    • Move the source to different locations along the source tunnel and plot the different distances and count rates





PAS Feasibility Study Runs