PAS Feasibility Preliminary Runs: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Harpconn (talk | contribs)
No edit summary
Line 5: Line 5:
General run plan
General run plan


Run source in and source out in experimental setup and background subtract with NaI
* Run source in and source out in experimental setup and background subtract with NaI


Run source in and source out in experimental setup and background subtract with He3
** Move the source to different locations along the source tunnel and plot the different distances and count rates
 
*Run source in and source out in experimental setup and background subtract with He3
 
** Move the source to different locations along the source tunnel and plot the different distances and count rates





Revision as of 15:35, 17 July 2021

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
    • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
    • Move the source to different locations along the source tunnel and plot the different distances and count rates





PAS Feasibility Study Runs