Difference between revisions of "PAS Feasibility Preliminary Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
General run plan
 
General run plan
  
Run source in and source out in experimental setup and background subtract with NaI
+
* Run source in and source out in experimental setup and background subtract with NaI
  
Run source in and source out in experimental setup and background subtract with He3
+
** Move the source to different locations along the source tunnel and plot the different distances and count rates
 +
 
 +
*Run source in and source out in experimental setup and background subtract with He3
 +
 
 +
** Move the source to different locations along the source tunnel and plot the different distances and count rates
  
  

Revision as of 15:35, 17 July 2021

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
    • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
    • Move the source to different locations along the source tunnel and plot the different distances and count rates





PAS Feasibility Study Runs