Difference between revisions of "CH PAS Master Timeline"

From New IAC Wiki
Jump to navigation Jump to search
Line 10: Line 10:
  
 
=June=
 
=June=
 +
 +
==6/9/21==
 +
 +
* Began data colleciton for He3 Borated Poly attenuation study
  
 
==6/11/21==
 
==6/11/21==

Revision as of 23:47, 25 June 2021

Timeline

This page will be used to document when each task is completed as a master reference for all work logged in the wiki. The plan is to make things easier when I need to pull things in the future.

May

5/10/21

Attended intern orientation for first day at INL

June

6/9/21

  • Began data colleciton for He3 Borated Poly attenuation study

6/11/21

  • Finished data collection for He3 Borated Poly attenuation study

6/22/21

  • Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul

6/25/21

  • Began BorAl attenuation measurements including overnight background runs

Go Back


PAS_Experiment